FURDER FRD80 Traction Machine For Freight Elevator
FURDER FRD80 traction-machine sourcing for freight-elevator projects that require a documented review of load, speed, roping, brake, power, and mounting data.
Description
FURDER FRD80 traction-machine sourcing for freight-elevator projects that require a documented review of load, speed, roping, brake, power, and mounting data.
Use this page for a model-specific replacement enquiry
This page is for buyers who already have an installed component or a defined project requirement. The product name is not enough to confirm fit. HS Lift Parts uses the identifiers, photographs, ratings, dimensions, interfaces, and system information supplied with the enquiry to narrow the request to the relevant configuration.
Model/application reference: FRD80 heavy-duty application; quoted configuration must be checked against the project.
Verified reference data
| Item | Published value |
|---|---|
| Power supply | AC 380V |
| Traction ratio | 2:1 |
| Protection grade | IP41 |
| Elevator speed | 2.0 m/s |
| Rated capacity | 16,000 kg |
| Brake | AC 220V; 8 × 3.0A |
| Maximum axial load | 75,000 kg |
| Duty type | S5 – 40% |
Selection note: These values describe the published product reference; they do not prove interchangeability with another model or revision. Confirm the complete offered specification against the original equipment and project documents.
Compatibility checks before quotation
- Confirm rated load, contract speed, suspension/roping, and travel.
- Provide sheave diameter, groove profile, and rope specification.
- Verify power supply, motor control, encoder/feedback, and brake circuit.
- Submit machine-room layout, mounting dimensions, axial-load requirement, and drawings.
What to send with your enquiry
Include clear front, rear, connector, mounting, and nameplate photographs; the original manufacturer, model, part number, serial or revision; the elevator or escalator model; electrical ratings; dimensions; quantity; installation country; and any relevant drawings or manuals. For modernization work, explain which equipment will remain and which components will change.
Replacement and modernization use
FURDER FRD80 Freight Elevator Traction Machine may be considered only after the project data has been reviewed. A replacement enquiry should identify the failed or removed component and preserve all critical interfaces. A modernization enquiry should also document controller, drive, feedback, brake, communication, mechanical, mounting, commissioning, and local inspection requirements as applicable.
Buyer questions
Can compatibility be confirmed from the model name alone?
No. Revisions, ratings, connectors, firmware, dimensions, mounting, and application details may vary within a model family.
Can HS Lift Parts select the item from photographs?
Photos are useful evidence, but they should be supported by nameplate data, measurements, system details, and technical documentation wherever possible.
Who should approve installation?
A qualified elevator or escalator professional must verify suitability and carry out installation, testing, and commissioning according to project and local requirements.
Request a compatibility-focused quotation
Send the original identifiers, technical data, photographs, quantity, and delivery destination so the requirement can be reviewed.
